Infrastructure

 

I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
 
 
: 30 acres
 
: Handed over the land. Not transferred.
 
 
:1991
 
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
 
: (Completed )
 
50% of the area
50% of the area
iii
Permanent buildings constructed
 
 
: CBRI pattern
iv
School building
 
 
 
: Completed
v
Dormitories
:  Boys 2  Nos.
   with Warden Residence 2  Nos.
 
 
 
:  Girls 2 Nos.
   with Warden Residence 2 Nos.
 
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
 
 
:  Complete, Area ______
 
One shift only
 
vii
Principal Residence
 
 
: Yes
 
viii
Staff Quarters
 
 
 
 
: Type III (old)= 12 Nos, New-12 Nos. Total 24
  Type II = 1 No.
  Type  I  = 12 Nos.
  SP Sheds converted into Staff Qrs.: Nil.
 
ix
M.P. Hall
 
: Available
x
Workshop
 
: Available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
 
: Column based
 
: 1,00,000 litres
 
: Working satisfactory
xii
U.G. tank
 
Its capacity
 
Present Status
 
:  1,00,000 litres
 
: Working satisfactory
xiii
D.G. Set
 
 
 
 
:  Available
: Kirloskar make
:   10  KV
: Working
: Year of procurement
 
xiv
Sewage Pump
 
: ________ H.P.- Not available
xv
Water Pump
 
 
:  3 submergible pumpsets of 3 H.P capacity.
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
 
 
 :  Urban Feeder
:   Incomplete (Not sanctioned)
: __________ Nos. of Poles
 
: 11.45 hrs. average
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
 
 
: Not available. 200 metre track available
:  2 Nos.   – Available
:  6 Nos.   – Available
 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
: Potable,  03  Nos.-  working
: Potable,  03 Nos.  - working
:  ______ hours supply in a day
xix
Rajiv Gandhi Smriti Van
 
:  Available
xx
Fire fighting arrangement
 
:  Working
xxi
Last date of cleaning of
(a)    Septic tank
(b)    Water tanks
 
:
:
xxii
Whether area around transformer is fenced
:  Yes 
xxiii
Whether open wells, if any, are covered from top
:   Yes
xxiv
Works taken up under M&R fund during current year and last year:-
 
:
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year